Project Documents & Other Resources

December 4, 2018 – Open House #3 Presentation Graphics

Project Scroll – Alternative 4​
Project Scroll – Alternative 5​
W 30th Ave Between Spenard Rd and N Star St Cross Sections 
W 32nd Ave Between Spenard Rd and N Star St Cross Sections 
W 32nd Ave Between Arctic Blvd and C St Cross Sections 1 
W 32nd Ave Between Arctic Blvd and C St Cross Sections 2 
W 32nd Ave Between C St and A St Cross Section 
Calais Dr Between A St and Denali St Cross Section 
E 33rd Ave Between Denali St and OSH Cross Section 

Draft Design Study Report

16-29 W. 32nd Ave & E. 33rd Ave Upgrades Draft DSR
Appendix A – Existing Utilities Drawings
Appendix B – Roadway Plan & Profile Drawings
Appendix C – Storm Drain Plan & Profile Drawings
Appendix D Part A – Storm Drain Condition Assessment Report
Appendix D Part B – Storm Drain Condition Assessment Report
Appendix E – Storm Drain Modeling Data
Appendix F – Draft Geotechnical Report
Appendix G – Traffic Data and Reports
Appendix H – Pedestrian and Bicycle Information
Appendix I – Existing ROW Maps and Easement Spreadsheets
Appendix J – Project Cost Estimates
Appendix K – Public Involvement
Appendix L – Business List

Roadway Design Alternatives

The following alternatives will be presented at a Public Open House on December 6th, 2017 from 5:00 to 7:00 PM at 3000 Arctic Boulevard (AWWU).  The final selected alternative may incorporate elements from one or more of the three alternatives presented.  Please provide comments at the Open House or electronically through the link at the top of this page.

Alternative 1
Alternative 2
Alternative 3

Concept Report

Concept Report
Concept Report - Appendices

Resources

Anchorage Vision Zero
Anchorage Bike Implementation Plan
Anchorage Pedestrian Implementation Plan


Sign Up Now